# Planning Package Version
**Package:** Adventure Storyteller Planning Package v2
**Revision date:** 2026-09-01
**Status:** Phase 0 complete; architecture selected; production milestone plan approved for milestone-by-milestone implementation.
**Package:** Adventure Storyteller Planning Package v2.1
**Revision date:** 2026-09-02
**Status:** Phase 0 complete; architecture selected; **Milestone M1 implemented and accepted**; M2 not yet briefed.
## v2.1 — Post-M1 Corrections (2026-09-02)
M1 implementation evidence contradicted or under-specified parts of v2. The
corrections are recorded in the documents themselves and listed in
`README.md` § *Post-M1 corrections applied*; the evidence behind them is in
`reports/M1-BASELINE-REPORT.md` and `reports/M1-IMPLEMENTATION-REPORT.md`.
In summary:
- a trusted-LAN Ollama may be **HTTPS with a privately issued certificate**;
clients verify against the operating system's CA store, with full certificate
and hostname verification and no bypass option (ADR 002,
`TECHNICAL-DESIGN.md` §5, A06),
- offline claims require a **fresh cache and no route out** to be evidence at
all, and vendored runtime artifacts should be integrity-verifiable
(ADR 004),
- A05's invariant is about **accepted** history; the user's submitted text is
deliberately retained on a failed turn,
- A06 requires a **real second machine and an HTTPS endpoint**; a plain-HTTP
LAN test is no longer sufficient evidence,
- the standard test environment records **CPU/GPU/RAM**, because cold model
load on a CPU-only host exceeded the inherited 120 s client timeout,
- `BUILD-MILESTONES.md` records M1 as complete and reframes M2's endpoint work
as **narrowing** an existing capability rather than inventing it,
- `SECURITY-THREAT-MODEL.md` §53 distinguishes **inbound** TLS (still deferred)
from **outbound** certificate verification (required, done in M1).
Nothing in the architecture selected in v2 was reversed.
## v2 — Post Phase 0B Revision (2026-09-01)
This v2 package supersedes the earlier planning package produced before the final Phase 0B review and the trusted-LAN Ollama deployment clarification.