M11 closeout: accept v1 release validation
The browser, offline and identity runs had last been taken onef25b0a. The closeout repeated them on the exact release-candidate tree,3652dc6, whose product code is identical to96c1bf5, where the 100-turn evidence was run. No product code changed, so the long-run evidence stands. On3652dc6: - backend suite: 1421 passed, 17 skipped, 0 failed - frontend suite: 161 of 161; lint clean - production build clean - docker build --no-cache: image SPA byte-identical to the local build - browser regression: 38 of 38 - no-network container: 23 of 23 - identity diagnostic: 0 signals; the scripted self-test's detectors fire - release-shaped smoke test from the image: 14 of 14 - M11 report: new S (exact-tree verification, including the identity results the report never carried) and T (acceptance record). Corrections: the REQUIRED FOR V1 count is 82, not 85, and L's browser narrator was qwen2.5:3b-instruct. P gains risks 16 and 17; risk 6 is widened. - BUILD-MILESTONES.md: M11 COMPLETE / ACCEPTED, and a post-v1 backlog. - V1-ACCEPTANCE-TESTS.md: the P release gate's result, and the P3 disposition's run. - planning/README.md, VERSION.md (v4.0), README.md: status, map, stop rule. - tools/m11_browser.py: the G01 import wait could not fail, because the scenario's campaign is titled "Hidden Knowledge". It now waits for the imported source's row. Found and carried, not fixed. The identity run stored protocol shapes the extractor leaves, on 4 of 10 turns at a 4,096 window: event-call syntax and a parroted length hint. The owner chose residual risk. The state rule's example is fantasy, and the state lagged the narration. None occurs in the 100-turn evidence. No requirement changes. No release tag. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01CBTT3qbkGoemWD7BRvvxpT
This commit is contained in:
co-authored by
Claude Opus 5
parent
3652dc6fae
commit
432f04100b
@@ -346,6 +346,10 @@ most interesting engineering in the repo.
|
||||
|
||||
## Repo notes
|
||||
|
||||
- **Status:** milestones M1-M11 are complete. The v1 release gate passed on
|
||||
2026-09-14 (see [`planning/reports/M11-IMPLEMENTATION-REPORT.md`](planning/reports/M11-IMPLEMENTATION-REPORT.md),
|
||||
§T). Passing the gate is not a release: there is no `v1.0.0` tag yet.
|
||||
|
||||
- `planning/` is this fork's own package: the product specification, the architecture
|
||||
decisions, the milestone plan, the acceptance contract, and a review report for every
|
||||
milestone shipped. Start at [`planning/README.md`](planning/README.md).
|
||||
|
||||