Update planning package after Phase 0B

This commit is contained in:
JesseMarkowitz
2026-09-01 20:41:23 -04:00
parent ba737de9b4
commit 717670afe0
34 changed files with 2061 additions and 1204 deletions
@@ -1,14 +1,14 @@
# ADR 008 — Complete Phase 0 Before Detailed Build Planning
**Status:** Accepted
**Status:** Accepted and completed
## Decision
The project will complete repository research, validation, architecture selection, and critical prototypes before writing the detailed production implementation milestone plan.
The project completed repository research, validation, architecture selection, and critical prototypes before finalizing the detailed production implementation milestone plan.
## Context
Multiple candidate open-source projects already implement overlapping parts of the desired system. The correct build sequence depends heavily on which codebase is selected.
Multiple candidate open-source projects implemented overlapping parts of the desired system. The correct build sequence depended on which codebase survived local validation.
## Alternatives Considered
@@ -18,10 +18,15 @@ Multiple candidate open-source projects already implement overlapping parts of t
## Reason
The third approach reduces speculative planning and prevents large amounts of rework.
The bounded Phase 0 prevented false assumptions from becoming production architecture. In particular, runtime testing discovered destructive AI-DnD Undo, an offline tokenizer fetch, remote fonts, Open Dungeon's lack of tests and destructive summary/history assumptions, and the relative-delta state-protocol failure mode.
## Completion Record
Phase 0 selected AI-DnD as the production base, validated the non-destructive head-cursor approach, selected explicit typed narrative-state events, established local-only hardening requirements, and produced the production `BUILD-MILESTONES.md`.
## Consequences
- `BUILD-MILESTONES.md` remains intentionally high level during Phase 0,
- production coding should not begin unless explicitly authorized,
- Phase 0 ends with the final build plan.
- the placeholder build plan has been replaced by a production milestone sequence,
- `SPECIFICATION.md` and `TECHNICAL-DESIGN.md` are the v1.0 planning baseline,
- production coding still requires explicit authorization and a milestone-specific prompt,
- the current review intentionally stops before preparing that prompt.