Update planning package after Phase 0B
This commit is contained in:
@@ -1,3 +1,5 @@
|
||||
> **Planning review note (2026-09-01):** This is the coding agent's Phase 0B evidence report. It is retained substantially as delivered. Some recommendations/open questions in the report were superseded during planning review: ai-adventure is an implementation reference rather than the project specification; no automatic abandoned-history cleanup is required in v1; Open Dungeon media portability is deferred; and the architecture decision is closed in ADR 009/010 and `TECHNICAL-DESIGN.md`.
|
||||
|
||||
# Phase 0B — Local Validation Findings and Recommendation
|
||||
|
||||
**Date:** 2026-09-01
|
||||
@@ -497,4 +499,4 @@ not after it.
|
||||
|
||||
Working tree, scripts and databases from both rounds are under `phase0b/`
|
||||
(untracked scratch, safe to delete). The spike itself is `phase0b/spike/`, a
|
||||
disposable copy of the AI-DnD backend — it is a proof, not a branch to merge.
|
||||
disposable copy of the AI-DnD backend — it is a proof, not a branch to merge.
|
||||
Reference in New Issue
Block a user