Update planning package after Phase 0B

This commit is contained in:
JesseMarkowitz
2026-09-01 20:41:23 -04:00
parent ba737de9b4
commit 717670afe0
34 changed files with 2061 additions and 1204 deletions
@@ -1,5 +1,7 @@
# Open Dungeon — Static Architecture Analysis
**Historical status:** Static Phase 0A analysis. Phase 0B confirmed Open Dungeon is a UX/media reference rather than the production base.
**Repository:** https://github.com/newideas99/open-dungeon
**Date reviewed:** 2026-09-01
**Disposition:** Finalist #2; strongest product/UI/media fit, but branch persistence requires material redesign.