12 KiB
Station Master — Card Reference
⚠ SUPERSEDED. This described an invented 52-card placeholder. The real catalogue arrived on 2026-07-30 in
docs/Deck cards2.xlsx,Trains3.pdfandMainline Cards.pdf, and is transcribed insrc/engine/content.ts. Seeimplications.mdfor the full comparison.Kept for the reasoning it records — the economy analysis in §7 was how we knew what questions to ask the design. Do not use its numbers.
The per-card catalogue: what is printed on every card. This is the specification the rules engine instantiates from and that any print-and-play layout renders. It says what each card says, not how it looks.
Derived from rules-v0.2.md §12 and the Gap 10 decisions in
open-questions.md.
All values provisional — calibration targets to retune after play.
1. The Home Office deck — 52 cards
| Category | Cards | §12.1 |
|---|---|---|
| Timetabled Trains | 12 | one each, 1–12 |
| Extra Trains | 4 | X9–X12 |
| Office upgrades | 9 | Depot ×4, Station ×3, Terminal ×2 |
| Freight Facilities | 10 | 5 types × 2 |
| Modifier Facilities | 5 | one each |
| Plain track | 12 | turnout ×6, straight ×3, run-around ×3 |
| Total | 52 |
2. Freight Facility cards
Ten cards, five types in identical pairs. Every freight facility card carries: a track with the
Operational Rail wheel icon, an industry track of the stated length, Laborer icons, the
MEN | AT | WORK three-box turn track, and its green Outbound and/or red Inbound boxes.
| Facility | Car type | Direction | Laborers | Outbound | Inbound | Industry track | Copies |
|---|---|---|---|---|---|---|---|
| Mine Tipple | Hopper | Outbound only | 3 | 3 | — | 4 | 2 |
| Produce Shed | Reefer | Outbound only | 2 | 2 | — | 3 | 2 |
| Grocer's Warehouse | Boxcar | Both | 2 | 2 | 2 | 3 | 2 |
| Oil Refinery | Tank car | Both | 3 | 2 | 2 | 4 | 2 |
| Power Plant | Hopper | Inbound only | 3 | — | 3 | 4 | 2 |
Directions follow the commodity: coal originates at a Mine Tipple and is consumed at a Power Plant; produce ships out; a warehouse and a refinery do both. This gives §9 all three of its cases — outbound-only, inbound-only, and both.
"Freight House" (§9.3, Appendix A) is not a card. It is the collective term for a freight facility that loads and unloads — the Grocer's Warehouse and the Oil Refinery. §9.3's "Passenger Facilities and Freight Houses permit cars to move each direction" therefore names exactly those two.
Throughput — why these Laborer counts
A complete freight load takes four Laborer-actions (§9.3): Green → MEN → AT → WORK → onto the car. Laborers are usable once each per Stage.
MEN | AT | WORK is a pipeline, not a queue. §9.1 allows one Load on each of its three boxes, so
up to three loads are in flight at once and each Laborer advances one of them per Stage. This is the
key to reading the numbers: Laborer count is throughput, not latency.
single load, 2 Laborers → completes in 2 Stages
single load, 3 Laborers → completes in 2 Stages (no faster!)
pipeline full, 3 Laborers → one load completes EVERY Stage
The extra Laborer buys nothing on one load and triples output on a full pipeline.
And the pipeline can only be fed one load per Stage, because stocking the green box costs a whole Local Operations action (§6.3). So a 3-Laborer facility is exactly balanced against the feed rate — it completes loads as fast as a player can possibly supply them. The 2-Laborer facilities are the deliberately slower industries, unable to quite keep up with a dedicated player.
That is why Laborer counts track Outbound capacity: Mine Tipple 3/3, Power Plant 3/3, Produce Shed 2/2, Grocer's Warehouse 2/2. The numbers are derived from the action budget, not chosen freely.
The Oil Refinery is the exception at 3 Laborers against 2+2 capacity, and deliberately so: it serves two flows through one three-box pipeline, so its pipeline stays fuller than a one-way facility's and the third Laborer is earning its keep.
Even so, Laborers are rarely what limits a player — spotting the empty car and hauling the loaded one away both cost switching actions from the same budget. See §7.
3. Train cards
Sixteen cards. Each carries its number, a direction from the card image, the consist specification, and the required order: engine at the front, revenue cars, caboose last where required.
Odd numbers run westbound, even eastbound. Pairs are sister trains under the optional rule (Appendix B). Seniority runs passenger-first — low numbers are the varnish, high numbers the drags and locals.
| Trains | Class | Consist | Direction |
|---|---|---|---|
| 1 / 2 | Limited | 4 coaches, no caboose | W / E |
| 3 / 4 | Mail-Express | 3 coaches, no caboose | W / E |
| 5 / 6 | Manifest Freight | 3 boxcars or reefers + caboose | W / E |
| 7 / 8 | Coal Drag | 3 hoppers + caboose | W / E |
| 9 / 10 | Oil Train | 3 tank cars + caboose | W / E |
| 11 / 12 | Way Freight | 3 cars of any type + caboose | W / E |
| X9, X10, X11, X12 | Extra | Any 3 cars + caboose, player's choice | Head-on — player chooses |
A Crew Tray holds at most four Rolling Stock and a caboose counts toward that four (§A.4), which is why no caboose train carries more than three revenue cars.
Only trains 1–4 carry coaches, so passenger work at any Office depends on those four trains' visits.
4. Office cards
Nine upgrade cards in the deck (Depot ×4, Station ×3, Terminal ×2 — the pyramid Gap 3b requires). Whistle Posts are a fixed supply outside the deck (§12.2).
| Office | Control Point | Passenger Facility | A/D tracks | Porters | Green slots | Red slots | In deck |
|---|---|---|---|---|---|---|---|
| Whistle Post | no | no | 1 | — | — | — | supply |
| Depot | yes | yes | 2 | 1 | 2 | 2 | 4 |
| Station | yes | yes | 3 | 2 | 3 | 3 | 3 |
| Terminal | yes | yes | 4 | 3 | 4 | 4 | 2 |
Slot capacity deliberately exceeds Porter count. Only trains 1–4 carry coaches, so an Office needs somewhere to bank boarding passengers between visits and room to absorb a whole trainload of arrivals. Slot counts mirror the A/D track progression.
All four tiers carry identical track geometry (§11.3): a through track plus a plain junction stub above and below. Upgrades are drop-in and must never disturb a connection.
5. Modifier cards
Five cards, one each. A Modifier is not track. It is placed adjacent to a Facility, on any of the nine nearby spots, and if adjacent to two Facilities its effect may be used on only one per Stage (§9).
| Card | Effect | Applies to |
|---|---|---|
| Team Track | +1 car on the industry track | Freight |
| Loading Dock | +1 green Outbound capacity | Freight |
| Storage Shed | +1 red Inbound capacity | Freight |
| Extra Platform | +1 green and +1 red slot | Passenger |
| Section Gang | +1 Laborer or +1 Porter | Either |
Capacity modifiers matter more than they sound: banking room, not worker count, is what limits output. Section Gang is the only way to speed a facility up, and is deliberately the sole worker-adding card.
6. Track cards
Twelve plain track cards. Every one carries the Operational Rail wheel icon except turnouts, which a train may pass through but not stop on (§A.1).
| Geometry | Count | Notes |
|---|---|---|
| Turnout | 6 | Enter from A → B or C; enter from B or C → A only. Not Operational Rail. |
| Straight | 3 | Operational Rail |
| Run-around | 3 | Operational Rail. Required for the facing-point move of §A.5. |
Turnout-heavy because turnouts are how Secondary Track branches onward once the Office card's own junction stubs are built out (§11.3).
7. Economy summary
Local Operations actions are the main currency. One per Stage, twelve per Day, and each is exclusive — switch, or draw, or work the Freight Agent (§6).
| Revenue source | Local Ops cost |
|---|---|
| Freight load out | 1 to stock the green box, plus amortized switching |
| Freight unload | none up front — 1 later, only once the red box fills |
| Passenger boarding | 1 to stock a loaded coach |
| Passenger de-training | none up front — 1 later to clear the slot |
⚠ Corrected against simulation. An earlier version of this section claimed every Revenue point costs about one action, giving a ceiling of 12/Day. That is wrong, and the error is instructive: the two inbound operations need no Local Ops action at all at the moment they score. A loaded car arrives on a train, per-Stage Laborers walk it off, and the point is earned using only free per-Stage resources. The action is spent later, and only when a box actually fills.
That earlier correction was itself measured against a scoring bug — unloads were paying a full Revenue point after one Laborer action instead of four. With the pipeline corrected, simulation gives ~0.9 Revenue/player/Day and a 0% win rate against these targets.
Treat the 5–6/Day figure as unfounded. It was derived from the mistaken model above and has not been re-derived. The measured cost of one freight point is four Laborer actions plus a stocking action plus the switching to spot a car. See
open-questions.mdGap 12.
The development ramp
Players open with a Whistle Post — not a Passenger Facility — and no freight facilities at all. The timetable also starts empty, so no trains run until someone draws and plays a train card.
Day 1 ~0 no facilities, no trains yet
Day 2 ~2 first facility placed, first train running
Day 3 ~5 developed
Day 4+ ~6 steady state
cumulative: 3 Days ≈ 7 5 Days ≈ 19 10 Days ≈ 49
The §3 victory targets (10 / 20 / 45) are set just under these cumulative figures, so a game is
winnable by a player running well and missed by one who is not. The Competitive collective floor of
3 × players × Days is about half of expected output and is comfortably met by a functioning
Division.
8. Fixed supplies (outside the deck)
| Component | Count |
|---|---|
| Mainline cards (tarot, 2 regions each) | N + 1 for N players |
| Division Point cards | 2 (East, West) |
| Whistle Post cards | N + spares |
| Limits cards | 2N + spares |
| Crew Trays and engines | player count + 3 |
| Number Boards | 12, numbered 1–12 |
| Red Flag cards | 1 per player (optional rule only; removed from game when played) |
| Fedora | 1 |
| Pocket Watch | 1 |
| D12 | 1 |
Rolling Stock — 62 pieces
| Type | Loaded | Empty |
|---|---|---|
| Coaches (blue) | 8 | 8 |
| Boxcars (brown) | 6 | 6 |
| Hoppers (brown) | 6 | 6 |
| Reefers (brown) | 4 | 4 |
| Tank cars (brown) | 4 | 4 |
| Cabooses (red) | 6 | — |
| Total | 62 |
Supply check against facility demand. Worst case is every copy of every facility in play at once with all boxes full:
| Car | Facility demand | Supply | Headroom |
|---|---|---|---|
| Hopper | Mine Tipple 3×2 + Power Plant 3×2 = 12 | 12 | exactly met |
| Tank | Oil Refinery (2+2)×2 = 8 | 8 | exactly met |
| Boxcar | Grocer's (2+2)×2 = 8 | 12 | 4 spare |
| Reefer | Produce Shed 2×2 = 4 | 8 | 4 spare |
| Coach | Terminal 4+4, per Office | 16 | scales with Office count |
Hoppers and tank cars are exactly met in the theoretical worst case, which cannot occur in practice — only 10 freight facility cards exist across a 52-card deck shared by all players, and the §2.2 Classification Yard recycle returns stock to the Division Yard whenever it empties. Both are worth watching in playtesting.