JesseMarkowitzandClaude Opus 5 62a997f364 M4: close out Save Points, with browser verification
Closes M4. The review's three findings are fixed, the durability rule the
specification always implied is now enforced, and M3's and M4's browser
behaviour has been verified in a real browser for the first time.

B-1 -- the Save Point list was an N+1 that loaded whole Action rows,
narration included, to answer "does a row exist here". It is now one bulk
two-column coordinate query plus one lineage: 53 SELECTs for 25 Save Points
became 5, and the count no longer grows with the list. The clause is an OR
of exact (branch, depth) pairs rather than two IN lists, because the cross
product would report a Save Point resolved on the strength of another one's
depth existing on this one's branch. A test builds exactly that trap.

B-2 -- reclassified during closeout from "missing warning" to a behaviour
defect, and fixed as one. STORY-BRANCH-SEMANTICS §19 says a named checkpoint
remains until explicitly deleted, and §28 already required future cleanup to
retain checkpoint-referenced paths; a cascade that silently removed Save
Points with a branch violated both, and a warning would only have documented
the violation. A branch a Save Point names can no longer be deleted. The
request is refused with the offending Save Points named, the user deletes
them explicitly -- which deletes no story -- and the branch then goes. The
scope is the subtree, because deleting a branch takes its descendants. Both
delete controls disable and explain. Recorded as a new §19.1; models.py,
TECHNICAL-DESIGN §8.8 and DATA-MODEL §8 had all recorded the cascade as the
rule and now record the refusal.

An earlier pass in this same closeout had kept the cascade and added a
warning. That was the wrong fix and its tests were replaced rather than left
standing, since they pinned the defect.

B-3 -- the D11/L03 automation never left one process, so it could not
distinguish durable state from a live Python object. It now spawns real
server processes, kills the first, and reads the campaign back with the
second.

C-5 -- creating a Save Point takes the campaign's turn lock. "Save where I
am" has to name one committed position, and the head is what a turn in
flight is about to move. Rename and Delete deliberately do not take it.

The architecture is untouched: a Save Point is still name + note +
(branch, depth), and restore is still coordinate -> head.move_to_node ->
head.move_to -> attempts.restore_state. No second restore path, no state
copied into a checkpoint, no fork on restore.

Browser verification -- the first in this project, and it covers both
milestones. Firefox 154.0.1 through geckodriver over the W3C WebDriver
protocol, driving the rendered DOM: 47/47 checks, twice, on independent
databases, no console errors. M3's Undo/Redo enable states, transcript
movement, Retry and the take pager, divergence retiring Redo; M4's whole
Save Point lifecycle, both confirmations, and the new branch-delete refusal
including its recovery. No dependency was added: the WebDriver client is
stdlib HTTP.

No application defect was found by the browser. Four failures occurred, all
in the harness -- a wrong SPA route, a wait comparing transcript length when
the empty-story placeholder is longer than the first turn, a fixture
deleting the branch it was reading, and a reload assertion that sampled
once instead of waiting. The last was checked against the app before being
called a harness bug.

Tests: 698 backend pass (was 680), 60 M4, 94 M3 history, 66 export/
migrations, 93 security/local-only. Frontend lint and build clean, Docker
build clean, loopback binding unchanged. No assertion weakened, no skip
added.

Planning: STORY-BRANCH-SEMANTICS §19.1 is the only behavioural change and it
strengthens §19. V1-ACCEPTANCE-TESTS records D11-D14, I04, L03 and the
E-series, keeping automated, live-runtime and browser evidence distinct, and
weakens no pass condition. DATA-MODEL records the coordinate with the retry
measurement that settles it. BROWSER-UX-SPEC rules for Moment over Turn.
BUILD-MILESTONES marks M4 COMPLETE, closes M3's browser condition, and lists
what M5 inherits. VERSION adds v2.6.

No new ADR: ADR 005 already decides that history is preserved rather than
overwritten, and §19.1 is that decision applied to checkpoint-referenced
history.

M4 is closed. M5 may now be briefed; it has not been started.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PWU4gTfLYY6Qq9U7aa9Qw2
2026-09-04 06:34:56 -04:00

4.3 KiB

ChatGPT Project Sources — what to upload

This file exists for one purpose: to tell the repository owner which files belong in the InteractiveStory ChatGPT project's Sources. It is not a documentation index — planning/README.md is that.

planning/project-sources.txt is the same list as bare paths, one per line, for gathering the files.

The rule behind the list: upload what is authoritative now. A project source is treated as current fact by whatever reads it, so a superseded document uploaded alongside a current one does not add context — it manufactures a conflict.

Refresh the Sources whenever the planning package is revised (VERSION.md records each revision) and whenever a milestone completes.

REQUIRED PROJECT SOURCES

Twenty-eight files.

Repository orientation

README.md
DEVELOPMENT.md
PROVENANCE.md

The planning index and its version

planning/README.md
planning/VERSION.md

Product requirements and design

planning/SPECIFICATION.md
planning/TECHNICAL-DESIGN.md
planning/DATA-MODEL.md
planning/STORY-BRANCH-SEMANTICS.md
planning/CONTEXT-AND-MEMORY.md
planning/IMPORTED-KNOWLEDGE-DESIGN.md
planning/SECURITY-THREAT-MODEL.md
planning/MEDIA-EXTENSION-CONTRACT.md
planning/BROWSER-UX-SPEC.md

Implementation plan and acceptance contract

planning/BUILD-MILESTONES.md
planning/V1-ACCEPTANCE-TESTS.md
planning/TEST-CAMPAIGN-FIXTURE.md

The active ADRs — all eleven. They are short, and each one closes a question that will otherwise be reopened.

planning/DECISIONS/001-browser-first.md
planning/DECISIONS/002-ollama-only-v1.md
planning/DECISIONS/003-authoritative-local-state.md
planning/DECISIONS/004-local-only-production.md
planning/DECISIONS/005-branch-preserving-history.md
planning/DECISIONS/006-genre-agnostic-core.md
planning/DECISIONS/007-future-media-extension.md
planning/DECISIONS/009-ai-dnd-production-base.md
planning/DECISIONS/010-explicit-typed-narrative-state-events.md
planning/DECISIONS/011-local-inference-endpoint-policy.md
planning/DECISIONS/012-active-head-non-destructive-history.md

ADR 008 is deliberately absent: it was the process gate requiring Phase 0 to close before production work began, Phase 0 closed on 2026-09-01, and it is now in planning/archive/decisions/.

CURRENT-MILESTONE SOURCE

One file, and it changes as development progresses:

planning/reports/M4-IMPLEMENTATION-REPORT.md

M4 is the most recently completed milestone, and M5 is the next to be briefed. This report is M4's review and its closeout record: its §W holds the corrective work, the process-boundary automation, and the real-browser verification that closed the condition M3 and M4 both carried.

Replace it, do not accumulate. When M5's report lands, remove this one from the project Sources and upload M5's instead. The repository does the same thing: planning/reports/ holds the current milestone's report and planning/archive/milestone-reports/ holds the rest.

DO NOT UPLOAD AS PROJECT SOURCES

Not because these are worthless — because a source is read as current fact, and these are not current.

  • Everything under planning/archive/. The Phase 0 research reports, the Phase 0B recommendation and spikes, the completed M1 and M2 milestone reports, and archived ADR 008. Every conclusion they reached that still matters has already been applied to the active documents; what is left is superseded reasoning that will contradict the current package if uploaded beside it.
  • Older milestone reports, once their successor exists. Uploading M1, M2 and M3 together produces three descriptions of the same subsystem at three different stages.
  • Source code. backend/, frontend/, tests, migrations. The planning package describes the system; the code is read in the repository, where it can be searched and run.
  • Inherited upstream documentation. Upstream AI-DnD's plan/ build log and docs/ guides, generated HTML and screenshots were deleted from this repository on 2026-09-03 for exactly this reason: they describe a hosted, scripted, multi-user product this fork removed. Do not re-upload them from upstream or from Git history.
  • Generated HTML, images and screenshots. They add tokens, not facts.