# Station Master — Card Reference
|
||
|
||
> **⚠ SUPERSEDED.** This described an invented 52-card placeholder. The real catalogue arrived on
|
||
> 2026-07-30 in `docs/Deck cards2.xlsx`, `Trains3.pdf` and `Mainline Cards.pdf`, and is transcribed
|
||
> in `src/engine/content.ts`. See [`implications.md`](implications.md) for the full comparison.
|
||
>
|
||
> Kept for the reasoning it records — the economy analysis in §7 was how we knew what questions to
|
||
> ask the design. **Do not use its numbers.**
|
||
|
||
The per-card catalogue: what is printed on every card. This is the specification the rules engine
|
||
instantiates from and that any print-and-play layout renders. It says *what each card says*, not how
|
||
it looks.
|
||
|
||
Derived from [`rules-v0.2.md`](rules-v0.2.md) §12 and the Gap 10 decisions in
|
||
[`open-questions.md`](open-questions.md#gap-10--card-face-specifications).
|
||
|
||
*All values provisional — calibration targets to retune after play.*
|
||
|
||
---
|
||
|
||
## 1. The Home Office deck — 52 cards
|
||
|
||
| Category | Cards | §12.1 |
|
||
| --- | ---: | --- |
|
||
| [Timetabled Trains](#3-train-cards) | 12 | one each, 1–12 |
|
||
| [Extra Trains](#3-train-cards) | 4 | X9–X12 |
|
||
| [Office upgrades](#4-office-cards) | 9 | Depot ×4, Station ×3, Terminal ×2 |
|
||
| [Freight Facilities](#2-freight-facility-cards) | 10 | 5 types × 2 |
|
||
| [Modifier Facilities](#5-modifier-cards) | 5 | one each |
|
||
| [Plain track](#6-track-cards) | 12 | turnout ×6, straight ×3, run-around ×3 |
|
||
| **Total** | **52** | |
|
||
|
||
---
|
||
|
||
## 2. Freight Facility cards
|
||
|
||
Ten cards, **five types in identical pairs**. Every freight facility card carries: a track with the
|
||
Operational Rail wheel icon, an industry track of the stated length, Laborer icons, the
|
||
`MEN | AT | WORK` three-box turn track, and its green Outbound and/or red Inbound boxes.
|
||
|
||
| Facility | Car type | Direction | Laborers | Outbound | Inbound | Industry track | Copies |
|
||
| --- | --- | --- | ---: | ---: | ---: | ---: | ---: |
|
||
| Mine Tipple | Hopper | Outbound only | 3 | 3 | — | 4 | 2 |
|
||
| Produce Shed | Reefer | Outbound only | 2 | 2 | — | 3 | 2 |
|
||
| Grocer's Warehouse | Boxcar | Both | 2 | 2 | 2 | 3 | 2 |
|
||
| Oil Refinery | Tank car | Both | 3 | 2 | 2 | 4 | 2 |
|
||
| Power Plant | Hopper | Inbound only | 3 | — | 3 | 4 | 2 |
|
||
|
||
Directions follow the commodity: coal originates at a Mine Tipple and is consumed at a Power Plant;
|
||
produce ships out; a warehouse and a refinery do both. This gives §9 all three of its cases —
|
||
outbound-only, inbound-only, and both.
|
||
|
||
**"Freight House"** (§9.3, Appendix A) is not a card. It is the collective term for a freight facility
|
||
that loads *and* unloads — the Grocer's Warehouse and the Oil Refinery. §9.3's "Passenger Facilities
|
||
and Freight Houses permit cars to move each direction" therefore names exactly those two.
|
||
|
||
### Throughput — why these Laborer counts
|
||
|
||
A complete freight load takes **four Laborer-actions** (§9.3): Green → MEN → AT → WORK → onto the
|
||
car. Laborers are usable once each per Stage.
|
||
|
||
**`MEN | AT | WORK` is a pipeline, not a queue.** §9.1 allows one Load on each of its three boxes, so
|
||
up to three loads are in flight at once and each Laborer advances one of them per Stage. This is the
|
||
key to reading the numbers: **Laborer count is throughput, not latency.**
|
||
|
||
```
|
||
single load, 2 Laborers → completes in 2 Stages
|
||
single load, 3 Laborers → completes in 2 Stages (no faster!)
|
||
|
||
pipeline full, 3 Laborers → one load completes EVERY Stage
|
||
```
|
||
|
||
The extra Laborer buys nothing on one load and triples output on a full pipeline.
|
||
|
||
**And the pipeline can only be fed one load per Stage**, because stocking the green box costs a whole
|
||
Local Operations action (§6.3). So a 3-Laborer facility is exactly balanced against the feed rate —
|
||
it completes loads as fast as a player can possibly supply them. The 2-Laborer facilities are the
|
||
deliberately slower industries, unable to quite keep up with a dedicated player.
|
||
|
||
That is why Laborer counts track Outbound capacity: Mine Tipple 3/3, Power Plant 3/3, Produce Shed
|
||
2/2, Grocer's Warehouse 2/2. The numbers are derived from the action budget, not chosen freely.
|
||
|
||
The Oil Refinery is the exception at 3 Laborers against 2+2 capacity, and deliberately so: it serves
|
||
two flows through one three-box pipeline, so its pipeline stays fuller than a one-way facility's and
|
||
the third Laborer is earning its keep.
|
||
|
||
Even so, Laborers are rarely what limits a player — spotting the empty car and hauling the loaded one
|
||
away both cost switching actions from the same budget. See §7.
|
||
|
||
---
|
||
|
||
## 3. Train cards
|
||
|
||
Sixteen cards. Each carries its number, a direction from the card image, the consist specification,
|
||
and the required order: **engine at the front, revenue cars, caboose last where required**.
|
||
|
||
Odd numbers run westbound, even eastbound. Pairs are sister trains under the optional rule (Appendix
|
||
B). Seniority runs passenger-first — low numbers are the varnish, high numbers the drags and locals.
|
||
|
||
| Trains | Class | Consist | Direction |
|
||
| --- | --- | --- | --- |
|
||
| 1 / 2 | Limited | 4 coaches, no caboose | W / E |
|
||
| 3 / 4 | Mail-Express | 3 coaches, no caboose | W / E |
|
||
| 5 / 6 | Manifest Freight | 3 boxcars or reefers + caboose | W / E |
|
||
| 7 / 8 | Coal Drag | 3 hoppers + caboose | W / E |
|
||
| 9 / 10 | Oil Train | 3 tank cars + caboose | W / E |
|
||
| 11 / 12 | Way Freight | 3 cars of any type + caboose | W / E |
|
||
| X9, X10, X11, X12 | Extra | Any 3 cars + caboose, player's choice | Head-on — player chooses |
|
||
|
||
A Crew Tray holds at most **four** Rolling Stock and a caboose counts toward that four (§A.4), which
|
||
is why no caboose train carries more than three revenue cars.
|
||
|
||
Only trains 1–4 carry coaches, so passenger work at any Office depends on those four trains' visits.
|
||
|
||
---
|
||
|
||
## 4. Office cards
|
||
|
||
Nine upgrade cards in the deck (Depot ×4, Station ×3, Terminal ×2 — the pyramid Gap 3b requires).
|
||
Whistle Posts are a fixed supply outside the deck (§12.2).
|
||
|
||
| Office | Control Point | Passenger Facility | A/D tracks | Porters | Green slots | Red slots | In deck |
|
||
| --- | :---: | :---: | ---: | ---: | ---: | ---: | ---: |
|
||
| Whistle Post | no | no | 1 | — | — | — | supply |
|
||
| Depot | yes | yes | 2 | 1 | 2 | 2 | 4 |
|
||
| Station | yes | yes | 3 | 2 | 3 | 3 | 3 |
|
||
| Terminal | yes | yes | 4 | 3 | 4 | 4 | 2 |
|
||
|
||
**Slot capacity deliberately exceeds Porter count.** Only trains 1–4 carry coaches, so an Office needs
|
||
somewhere to bank boarding passengers between visits and room to absorb a whole trainload of
|
||
arrivals. Slot counts mirror the A/D track progression.
|
||
|
||
**All four tiers carry identical track geometry** (§11.3): a through track plus a plain junction stub
|
||
above and below. Upgrades are drop-in and must never disturb a connection.
|
||
|
||
---
|
||
|
||
## 5. Modifier cards
|
||
|
||
Five cards, one each. A Modifier is **not track**. It is placed adjacent to a Facility, on any of the
|
||
nine nearby spots, and if adjacent to two Facilities its effect may be used on only one per Stage
|
||
(§9).
|
||
|
||
| Card | Effect | Applies to |
|
||
| --- | --- | --- |
|
||
| Team Track | +1 car on the industry track | Freight |
|
||
| Loading Dock | +1 green Outbound capacity | Freight |
|
||
| Storage Shed | +1 red Inbound capacity | Freight |
|
||
| Extra Platform | +1 green **and** +1 red slot | Passenger |
|
||
| Section Gang | +1 Laborer **or** +1 Porter | Either |
|
||
|
||
Capacity modifiers matter more than they sound: banking room, not worker count, is what limits
|
||
output. Section Gang is the only way to speed a facility up, and is deliberately the sole
|
||
worker-adding card.
|
||
|
||
---
|
||
|
||
## 6. Track cards
|
||
|
||
Twelve plain track cards. Every one carries the Operational Rail wheel icon **except turnouts**, which
|
||
a train may pass through but not stop on (§A.1).
|
||
|
||
| Geometry | Count | Notes |
|
||
| --- | ---: | --- |
|
||
| Turnout | 6 | Enter from A → B or C; enter from B or C → A only. Not Operational Rail. |
|
||
| Straight | 3 | Operational Rail |
|
||
| Run-around | 3 | Operational Rail. Required for the facing-point move of §A.5. |
|
||
|
||
Turnout-heavy because turnouts are how Secondary Track branches onward once the Office card's own
|
||
junction stubs are built out (§11.3).
|
||
|
||
---
|
||
|
||
## 7. Economy summary
|
||
|
||
**Local Operations actions are the main currency.** One per Stage, twelve per Day, and each is
|
||
exclusive — switch, *or* draw, *or* work the Freight Agent (§6).
|
||
|
||
| Revenue source | Local Ops cost |
|
||
| --- | --- |
|
||
| Freight load **out** | 1 to stock the green box, plus amortized switching |
|
||
| Freight **unload** | **none up front** — 1 later, only once the red box fills |
|
||
| Passenger boarding | 1 to stock a loaded coach |
|
||
| Passenger de-training | **none up front** — 1 later to clear the slot |
|
||
|
||
> **⚠ Corrected against simulation.** An earlier version of this section claimed every Revenue point
|
||
> costs about one action, giving a ceiling of 12/Day. **That is wrong**, and the error is
|
||
> instructive: the two *inbound* operations need no Local Ops action at all at the moment they
|
||
> score. A loaded car arrives on a train, per-Stage Laborers walk it off, and the point is earned
|
||
> using only free per-Stage resources. The action is spent later, and only when a box actually
|
||
> fills.
|
||
>
|
||
> That earlier correction was itself measured against a **scoring bug** — unloads were paying a full
|
||
> Revenue point after one Laborer action instead of four. With the pipeline corrected, simulation
|
||
> gives **~0.9 Revenue/player/Day and a 0% win rate** against these targets.
|
||
>
|
||
> **Treat the 5–6/Day figure as unfounded.** It was derived from the mistaken model above and has not
|
||
> been re-derived. The measured cost of one freight point is four Laborer actions plus a stocking
|
||
> action plus the switching to spot a car. See `open-questions.md` Gap 12.
|
||
|
||
### The development ramp
|
||
|
||
Players open with a Whistle Post — not a Passenger Facility — and no freight facilities at all. The
|
||
timetable also starts empty, so no trains run until someone draws and plays a train card.
|
||
|
||
```
|
||
Day 1 ~0 no facilities, no trains yet
|
||
Day 2 ~2 first facility placed, first train running
|
||
Day 3 ~5 developed
|
||
Day 4+ ~6 steady state
|
||
|
||
cumulative: 3 Days ≈ 7 5 Days ≈ 19 10 Days ≈ 49
|
||
```
|
||
|
||
The §3 victory targets (10 / 20 / 45) are set just under these cumulative figures, so a game is
|
||
winnable by a player running well and missed by one who is not. The Competitive collective floor of
|
||
`3 × players × Days` is about half of expected output and is comfortably met by a functioning
|
||
Division.
|
||
|
||
---
|
||
|
||
## 8. Fixed supplies (outside the deck)
|
||
|
||
| Component | Count |
|
||
| --- | --- |
|
||
| Mainline cards (tarot, 2 regions each) | N + 1 for N players |
|
||
| Division Point cards | 2 (East, West) |
|
||
| Whistle Post cards | N + spares |
|
||
| Limits cards | 2N + spares |
|
||
| Crew Trays and engines | player count + 3 |
|
||
| Number Boards | 12, numbered 1–12 |
|
||
| Red Flag cards | 1 per player *(optional rule only; removed from game when played)* |
|
||
| Fedora | 1 |
|
||
| Pocket Watch | 1 |
|
||
| D12 | 1 |
|
||
|
||
### Rolling Stock — 62 pieces
|
||
|
||
| Type | Loaded | Empty |
|
||
| --- | ---: | ---: |
|
||
| Coaches (blue) | 8 | 8 |
|
||
| Boxcars (brown) | 6 | 6 |
|
||
| Hoppers (brown) | 6 | 6 |
|
||
| Reefers (brown) | 4 | 4 |
|
||
| Tank cars (brown) | 4 | 4 |
|
||
| Cabooses (red) | 6 | — |
|
||
| **Total** | | **62** |
|
||
|
||
**Supply check against facility demand.** Worst case is every copy of every facility in play at once
|
||
with all boxes full:
|
||
|
||
| Car | Facility demand | Supply | Headroom |
|
||
| --- | ---: | ---: | --- |
|
||
| Hopper | Mine Tipple 3×2 + Power Plant 3×2 = 12 | 12 | exactly met |
|
||
| Tank | Oil Refinery (2+2)×2 = 8 | 8 | exactly met |
|
||
| Boxcar | Grocer's (2+2)×2 = 8 | 12 | 4 spare |
|
||
| Reefer | Produce Shed 2×2 = 4 | 8 | 4 spare |
|
||
| Coach | Terminal 4+4, per Office | 16 | scales with Office count |
|
||
|
||
Hoppers and tank cars are exactly met in the theoretical worst case, which cannot occur in practice —
|
||
only 10 freight facility cards exist across a 52-card deck shared by all players, and the §2.2
|
||
Classification Yard recycle returns stock to the Division Yard whenever it empties. Both are worth
|
||
watching in playtesting.
|