Files
station-master/test
Jesse.Markowitz 2ab25e320c v0.7.2 — a leg that is part of the row, the deck the sheet prints, regions not miles per hour, and a Division you read left to right
Gitea#17 — a 45° leg is an end of the west-to-east row, so backing into a cut
through a curve's south leg no longer couples it back to front. The same
assumption left a crew's own cut standing when it pulled out through a leg,
which is the "cars left behind" report we had failed to reproduce.

Gitea#14 — every count is docs/Deck cards5.xlsx. Track halved, and the Q12
office doubling and Gap 12 industry tripling both come out with it: they were
measured against a deck with twice the track, and keeping them at the sheet's
track count wipes out the reefer chain entirely. 84 rows now match card for
card; the ten Safety, Event and Inspection cards it adds are not built and are
held out. Cards the sheet no longer lists are dealt zero copies rather than
deleted, so their rules stay implemented.

Gitea#15 — RAR reversed it: a rail may stop dead against its neighbour and the
placement is legal. What must hold is that no train crosses the gap, which was
already true and is now pinned against the reported board.

Gitea#3 — the printed speeds are scenery. A card costs one Stage per printed
region and where a train STARTS is what varies; Fast/Slow is read on Hilly
alone. Entering a one-region card behind another is a collision now, which is
what ABS exists to prevent, and ABS no longer holds trains silently.

Gitea#18 — the Division draws as one row, west to east, with no office-area
detail. East is finally always to the right.

Closes #3
Closes #14
Closes #15
Closes #17
Closes #18
2026-08-26 15:20:56 -04:00
..